Sintered Metal Gears: OEM Components Manufactured Via Powder Metallurgy

Still deciding? Get samples of $ !
Order Sample

Product Description

ℹ️

Basic Specifications

Model NO.
KZ006
Process
Powder Metallurgy
Manufacturing Method
Powder Metallurgy
Production Capacity
50000 Pieces/Day
HS Code
8479909090
Origin
Jiangsu
⚙️

Product Description

Sintered Metal Gears

Excellent Powder Metallurgy Sintered Parts

High-quality iron-based and copper-based powder metallurgy parts tailored to your requirements. We specialize in converting your drawings or samples into high-precision metallic components with exceptional quality and competitive pricing.

🤝

Our Collaboration Process

1
Initial RFQ: Send your drawings, 3D models, or even just an idea/concept.
2
Fast Confirmation: Our team replies within 24 hours to confirm technical details.
3
Engineering Evaluation: We provide a formal offer within 1-3 working days.
4
Technical Meeting: Engineering consultations are available anytime to optimize the design.
Process Workflow
📋

Technical Parameters

MaterialIron, Stainless Steel, Copper
StandardsMPIF 35, DIN 30910, JIS Z 2550
ProcessingPowder Metallurgy, CNC Machining
ApplicationsHome appliances, Locksets, Electric tools, Automobile
Secondary OperationsHigh frequency quenching, Oil immersion
Quality Control100% Inspection with Carl Zeiss equipment
🖼️

Product Showcase

Detailed Sintered Component
🚀

Powder Metallurgy Advantages

Cost Effective

Reduces material waste and shortens machining time significantly.

Complex Shapes

Direct production of gears, splines, and complex profiles without extra machining.

High Precision

Achievable tolerances up to IT 5-7 after sizing operations.

Self-lubrication

Material porosity can be filled with oil for maintenance-free operation.

Advantage Graph

Frequently Asked Questions

Q1: How do you guarantee product quality?
We perform 100% inspection using high-precision testing equipment like Carl Zeiss to ensure size, appearance, and pressure requirements are met.
Q2: What is the typical delivery time for orders?
Generally, it takes 25 to 35 days after advance payment. Non-standard items may require an additional 10-15 days for tooling/mould fabrication.
Q3: Can you produce parts from specific drawings or samples?
Yes, we can manufacture components exactly according to your technical drawings or physical samples, including building necessary molds and fixtures.
Q4: How does the tooling charge work?
Tooling charges are applied only once with the first order. All future orders do not incur these charges, even if the tooling requires repair or maintenance.
Q5: What is your sample policy?
We can provide samples if we have parts in stock. However, customers are responsible for the sample and courier costs.
Q6: What are the payment terms?
Typically, a 50% prepayment is required, with the remaining balance settled before shipment.

Related Products