Basic Information
Service
OEM\ODM\Customized
Transport Package
Wooden Boxes Package
Production Capacity
500000 PCS/Year
Die Forging Details
| Application: |
Automobile, construction machinery, railway, petrochemical industry, etc |
| Material: |
4140/SCM440/42CrMo, ssw-QIR/65#steel, 65Mn, 50SiMn, QT800, ZG35SiMn, SSW-Q1 |
| Dimension: |
According to the customers' drawings |
| Process: |
Forging + machining + surface treatment |
| Quality Control: |
UT, MT, RT, PT, chemical composition test, mechanical property test, etc. |
| Heat Treatment: |
Quenching and Tempering |
| Coating: |
Black Oxide + Rust-proof oil |
| Standard: |
ASTM, ASME, DIN, JIS, ISO, BS, API, EN, GOST, etc |
| Certificates: |
Raw material cert, Heat treatment report, Dimension inspection, UT/MT test report |
| Packing: |
Seaworthy plywood packaged on steel pallets or as customer's request |
Customization Notice: All parts are custom made according to customer's drawings or samples. Technical drawings including material mark, product weight, and purchase quantity help us provide accurate pricing quickly.
Frequently Asked Questions
How long does it take to receive samples?
A) Pattern: 30-45 days after order.
B) Sample: 30 days after pattern finishing.
C) The lead time is the general production period and does not include transportation.
What is the new product development process?
Tooling and sample order with 50% deposit -> Internal development meeting -> Design and house-made mold/fixture/gauge -> Material procurement -> Machining -> Inspection -> Sample delivery with initial report.
How long is the manufacturing lead time for mass production?
Mass Production typically takes 90 days after sample approval. We can arrange special production effectively for urgent needs.
How do you deal with quality problems?
We perform APQP at early stages, implement strict patrol inspections, and conduct final audit checks on packed goods prior to dispatch to ensure all requirements are met.
What are your standard payment terms?
Generally, we request 50% tooling fee in advance with the balance upon sample acceptance. For production, we prefer 50% deposit and the balance by T/T before shipping.
How long does shipping take from China?
By Sea: Approx 6-7 weeks to Europe (including customs) and 2-3 weeks to US ports. By Air: Approx 7 days to all major destinations.